Construction Process:

Stage 1: Design

All Trusses and Floor Joists are designed using state of the art CAD software produced by ITW Alpine

Stage 2: Cut timber

Timber is cut ready for assembling into trusses

Stage 3: Manufacture

Trusses manufactured on site using a 35 tonne hydraulic press.

 

Stage 4: Delivery

Trusses Loaded onto the Lorry for Delivery